Hosted by Alstom
Location: Whistle Stop Pl, Wulkuraka QLD 4305
Start Time: From 10:00am
Duration: 1.5 hours
Number of Tours: 4 (all attendees arrive together and will be split into groups)
Capacity per Tour: 10 participants
Join Alstom for an exclusive behind-the-scenes tour of the QNGR Wulkuraka Maintenance Facility, delivered as part of the Qtectic Consortium. This guided experience offers a rare opportunity to see firsthand how Queensland’s New Generation Rollingstock fleet is maintained to ensure safe, reliable and efficient service for passengers.
Operated by the Qtectic Consortium — a long-term partnership responsible for the maintenance and performance of the QNGR fleet — the facility showcases world-class rail expertise, innovative technologies and collaborative delivery. Visitors will explore key areas of the depot and gain insight into modern train maintenance practices and the skilled teams who keep the fleet operating at peak performance.
This tour is ideal for those interested in rail operations, engineering and the future of sustainable transport.
PPE Requirements
- Long pants, long sleeves and closed-toe shoes are required. Alstom will provide high-visibility vests, bump caps and safety glasses.
- Zero drug and alcohol policy.